WORK / ONE MEASURED WINDOW
Six and a half months. 40 projects.
To show the tempo, we froze one six-and-a-half-month delivery window and counted everything in it. Every line is a project: what it is, when in the window it happened, and how little of the calendar it consumed. All figures computed from repository history.
40 of 42 projects shown; the rest await publication clearance.
40 projects shown · one 198-day window · 139 distinct working days across all 42 projects · computed, not estimated
The Year Ledger
- Technical requirements documents, transport modellingANONYMIZED
Prepared the complete technical requirements documents for a transport-modelling system and carried them through formal certification review to acceptance.
27days of actual work - LEED certification platform specification
Designed a complete product specification and investor documentation suite for an AI-assisted green-building certification platform.
10days of actual work - National road-condition analyticsANONYMIZED
Turned a national road-roughness survey's raw and partly broken field data into engineering-grade condition reports, a prioritized repair programme, and an interactive offline map agency staff open with a double click.
48days of actual work - Handwriting AI tutor
Built and put into daily home use a bilingual AI writing tutor that photographs a student's handwritten work, marks it up like a teacher, and adapts the next exercise to the student.
7days of actual work - Deposit-return system, national design
Designed Bulgaria's national deposit-return system end to end: architecture, draft legislation in two parallel editions, financial model, and a working machine simulator, up to near-submission drafts.
31days of actual work Shipped a public macOS product that makes Bulgarian smart-card e-signatures work reliably in browsers and PDF signing, delivered as a one-click installer with a self-healing background service.
10days of actual work- Multiplayer drawing game (alpha)
Built a working alpha of a multiplayer drawing game where friends take timed turns on a shared canvas while spectators react live.
6days of actual work - Delivery method & tooling
Built, and operates daily, the delivery system itself: a governance control plane installed into every project, independent clean-context reviews, and expertise packaged as installable AI skills.
48days of actual work - TAKT transit operations platform
Designed a full operations platform for mid-size bus and trolleybus companies and generated the first working services directly from its binding API contracts; a platform in development, not yet in production.
6days of actual work - Company-registry due-diligence pipeline
Proved, as a working proof-of-concept, an automated pipeline that pulls company deeds and documents from the national commercial registry for counterparty due diligence.
2days of actual work - National intelligent-transport strategy & draft lawANONYMIZED
Drafted, in an advisory role, a complete national strategy and draft law package for intelligent transport systems, including impact assessment and stakeholder briefings; not an adopted state act.
4days of actual work - Controlled institutional-document reworkANONYMIZED
Ran a controlled, machine-checked rewrite of a 13-document institutional package against a register of executive decisions, with frozen baselines, change control, and automated language gates.
12days of actual work - Municipal permit-registers surveyANONYMIZED
Surveyed all 265 Bulgarian municipalities' online construction-permit registers with AI agents and delivered a classified inventory covering 89.4% of them.
2days of actual work Built an internal analytics platform that collects complete tender dossiers from the national e-procurement portal and maps the money, entities, and modifications behind them.
15days of actual work- Tender integrity screening protocolANONYMIZED
Developed a protocol that reads full tender documents for integrity risks and applied it to real cases, including a EUR 39m tender scored 54/100 with every flag cited to the law.
5days of actual work - Professional-body platform designANONYMIZED
Co-designed, from a working session with a national professional body, the product blueprint for a platform managing its members, document flows, and quality reviews: a design, not an engagement.
2days of actual work - Compliance platform engine
Built the running multi-tenant engine that ahelia's compliance platforms plug into, with database-enforced tenant isolation and an extensive automated test suite.
12days of actual work - White Map of public transport
Published an interactive national map of public-transport coverage showing that 3,270 of Bulgaria's 5,256 settlements, home to 1.5 million people, have no bus stop.
1day of actual work - Municipal vehicle-tracking & stop-boards procurementANONYMIZED
Wrote the complete procurement package for a municipal trolleybus operator's vehicle-tracking and LED stop-display purchase, iterated with the client to signature-ready.
8days of actual work Built a queryable knowledge base of ~3,600 Bulgarian legislative acts with full amendment history, served live to AI tools; a free public browser is designed but not yet live.
15days of actual work- National AI-capacity policy briefsANONYMIZED
Authored and delivered policy briefs and an executive summary on national AI capacity to head-of-government and ministerial audiences; delivered advice, no adoption claimed.
5days of actual work - National single-ticket advisoryANONYMIZED
Researched Europe's single-ticket schemes and delivered a priced recommendation with a council-ready executive summary for a national public-transport ticket.
9days of actual work - National transport-model specification rescueANONYMIZED
Rescued a broken 300-page national tender specification: renumbered every requirement with published maps, rebuilt the document with a scripted pipeline, and delivered a clean version for client review.
7days of actual work - E-shop fiscal-software memoANONYMIZED
Answered, article by article against the primary law, whether an e-shop needs government-listed fiscal software, and specified the compliant build.
3days of actual work - Roof-height compliance screening pilotANONYMIZED
Piloted a screening workflow that cross-references municipal drone surveys with cadastre data to flag buildings taller than permitted, with a working map viewer.
10days of actual work - Document-estate authority auditANONYMIZED
Audited seven overlapping document workspaces to establish which of hundreds of drifting file versions is authoritative, recording a confidence level for every judgment.
12days of actual work - Technical requirements documents, ticketing systemsANONYMIZED
Prepared the technical requirements documents for public-transport ticketing systems, iterated through formal review rounds with full change traceability.
10days of actual work Built and published Bulgaria's first canonical register of public-transport stops: 13,974 stops consolidated from nine operators and two agencies, in EU standard formats, in days.
5days of actual work- EU e-commerce hub strategyANONYMIZED
Prepared a strategic memorandum, calculations, and a ministry-level presentation positioning Bulgaria as an EU e-commerce import hub.
6days of actual work Built verified knowledge bases for three green-building certification standards, every claim cited to primary sources and paywall boundaries recorded honestly, in four days.
3days of actual work- Transport-law implementing regulationsANONYMIZED
Drafting the implementing regulations under a newly adopted national transport law, with every provision traceable to a grounded legal source and machine-validated drafting style; in flight.
1day of actual work - Personal-health AI companion programANONYMIZED
Laid the full research, business case, and contract-first specification for a personal-health AI companion program; the software itself is not yet built.
9days of actual work - Traffic-planning legal memosANONYMIZED
Delivered legal-framework memos and content checklists for municipal traffic-organization and urban-mobility plans, with every citation verified against the primary legal corpus.
2days of actual work - Carbon-accounting-as-software research corpus
Researched whether corporate carbon measurement can be sold as maintained software instead of consulting hours, producing a fully sourced decision corpus; the platform itself is in design only.
4days of actual work - Transit data-feed quality auditANONYMIZED
Validated five municipalities' public-transport data feeds against the international standard and delivered a written quality report.
2days of actual work - E-invoicing regulatory watch brief
Produced a compact regulatory watch brief on Bulgaria's announced e-invoicing mandate: what is law versus announcement, the timeline, and the standards involved.
1day of actual work - Verifiable-voting platform design
Researched and specified an open-source verifiable-voting platform: vision, architecture, threat model, and ratified data contracts, building on a 2013 concept co-authored with a named collaborator; no code yet.
7days of actual work Replaced our own 15-year weekly-spreadsheet sales practice with a secure, EU-hosted pipeline app that runs for a few dollars a month; in production use within days.
7days of actual work- National water-sector digital strategy
Completed an independent, assurance-checked national strategy for digitalizing the urban water sector, grounded in four verified knowledge bases.
2days of actual work - Green-building lead engine (Sofia)
Built a register-grounded database of a capital city's large construction projects and their investors for green-building consulting: verified contacts, outreach angles, and a market-whitespace finding.
1day of actual work
40 projects shown · one 198-day window · 139 distinct working days across all 42 projects · computed, not estimated
This window is a frozen exhibit, not a live feed. The work continues beyond it.