Skip to content

WORK / JANUARY–JULY 2026

Six and a half months. 37 projects.

Every line is a project: what it is, when it happened, and how little of the calendar it actually consumed. All figures computed from repository history.

37 of 44 projects shown; the rest await publication clearance.

37 projects shown · window 05 Jan21 Jul 2026 (198 days) · 139 distinct working days across all 44 projects · computed, not estimated

The Year Ledger

  • LEED certification platform specification

    Designed a complete product specification and investor documentation suite for an AI-assisted green-building certification platform.

    ÷13.910 of 139 days
  • Turned a national road-roughness survey's raw and partly broken field data into engineering-grade condition reports, a prioritized repair programme, and an interactive offline map agency staff open with a double click.

    ÷2.748 of 129 days
  • Handwriting AI tutor

    Built and put into daily home use a bilingual AI writing tutor that photographs a student's handwritten work, marks it up like a teacher, and adapts the next exercise to the student.

    ÷5.77 of 40 days
  • Deposit-return system, national design

    Designed Bulgaria's national deposit-return system end to end: architecture, draft legislation in two parallel editions, financial model, and a working machine simulator, up to near-submission drafts.

    ÷4.531 of 141 days
  • Shipped a public macOS product that makes Bulgarian smart-card e-signatures work reliably in browsers and PDF signing, delivered as a one-click installer with a self-healing background service.

    ÷13.910 of 139 days
  • Multiplayer drawing game (alpha)

    Built a working alpha of a multiplayer drawing game where friends take timed turns on a shared canvas while spectators react live.

    ÷4.26 of 25 days
  • Delivery method & tooling

    Built, and operates daily, the delivery system itself: a governance control plane installed into every project, independent clean-context reviews, and expertise packaged as installable AI skills.

    ÷2.848 of 132 days
  • TAKT transit operations platform

    Designed a full operations platform for mid-size bus and trolleybus companies and generated the first working services directly from its binding API contracts; a platform in development, not yet in production.

    ÷2.26 of 13 days
  • Company-registry due-diligence pipeline

    Proved, as a working proof-of-concept, an automated pipeline that pulls company deeds and documents from the national commercial registry for counterparty due diligence.

    2d2 of 2 days
  • National intelligent-transport strategy & draft lawANONYMIZED

    Drafted, in an advisory role, a complete national strategy and draft law package for intelligent transport systems, including impact assessment and stakeholder briefings; not an adopted state act.

    ÷2.54 of 10 days
  • Controlled institutional-document reworkANONYMIZED

    Ran a controlled, machine-checked rewrite of a 13-document institutional package against a register of executive decisions, with frozen baselines, change control, and automated language gates.

    ÷3.512 of 42 days
  • Municipal permit-registers surveyANONYMIZED

    Surveyed all 265 Bulgarian municipalities' online construction-permit registers with AI agents and delivered a classified inventory covering 89.4% of them.

    5d2 of 5 days
  • Built an internal analytics platform that collects complete tender dossiers from the national e-procurement portal and maps the money, entities, and modifications behind them.

    ÷6.615 of 99 days
  • Developed a protocol that reads full tender documents for integrity risks and applied it to real cases, including a EUR 39m tender scored 54/100 with every flag cited to the law.

    ÷1.65 of 8 days
  • Compliance platform engine

    Built the running multi-tenant engine that ahelia's compliance platforms plug into, with database-enforced tenant isolation and an extensive automated test suite.

    ÷8.512 of 102 days
  • White Map of public transport

    Published an interactive national map of public-transport coverage showing that 3,270 of Bulgaria's 5,256 settlements, home to 1.5 million people, have no bus stop.

    1d1 of 1 days
  • Municipal vehicle-tracking & stop-boards procurementANONYMIZED

    Wrote the complete procurement package for a municipal trolleybus operator's vehicle-tracking and LED stop-display purchase, iterated with the client to signature-ready.

    ÷5.58 of 44 days
  • Built a queryable knowledge base of ~3,600 Bulgarian legislative acts with full amendment history, served live to AI tools; a free public browser is designed but not yet live.

    ÷6.215 of 93 days
  • National AI-capacity policy briefsANONYMIZED

    Authored and delivered policy briefs and an executive summary on national AI capacity to head-of-government and ministerial audiences; delivered advice, no adoption claimed.

    ÷2.05 of 10 days
  • National single-ticket advisoryANONYMIZED

    Researched Europe's single-ticket schemes and delivered a priced recommendation with a council-ready executive summary for a national public-transport ticket.

    ÷4.99 of 44 days
  • National transport-model specification rescueANONYMIZED

    Rescued a broken 300-page national tender specification: renumbered every requirement with published maps, rebuilt the document with a scripted pipeline, and delivered a clean version for client review.

    ÷10.17 of 71 days
  • E-shop fiscal-software memoANONYMIZED

    Answered, article by article against the primary law, whether an e-shop needs government-listed fiscal software, and specified the compliant build.

    ÷7.73 of 23 days
  • Roof-height compliance screening pilotANONYMIZED

    Piloted a screening workflow that cross-references municipal drone surveys with cadastre data to flag buildings taller than permitted, with a working map viewer.

    ÷1.410 of 14 days
  • Document-estate authority auditANONYMIZED

    Audited seven overlapping document workspaces to establish which of hundreds of drifting file versions is authoritative, recording a confidence level for every judgment.

    ÷5.012 of 60 days
  • Built and published Bulgaria's first canonical register of public-transport stops: 13,974 stops consolidated from nine operators and two agencies, in EU standard formats, in days.

    ÷1.65 of 8 days
  • EU e-commerce hub strategyANONYMIZED

    Prepared a strategic memorandum, calculations, and a ministry-level presentation positioning Bulgaria as an EU e-commerce import hub.

    ÷5.36 of 32 days
  • Built verified knowledge bases for three green-building certification standards, every claim cited to primary sources and paywall boundaries recorded honestly, in four days.

    4d3 of 4 days
  • Transport-law implementing regulationsANONYMIZED

    Drafting the implementing regulations under a newly adopted national transport law, with every provision traceable to a grounded legal source and machine-validated drafting style; in flight.

    1d1 of 1 days
  • Personal-health AI companion programANONYMIZED

    Laid the full research, business case, and contract-first specification for a personal-health AI companion program; the software itself is not yet built.

    ÷3.09 of 27 days
  • Traffic-planning legal memosANONYMIZED

    Delivered legal-framework memos and content checklists for municipal traffic-organization and urban-mobility plans, with every citation verified against the primary legal corpus.

    2d2 of 2 days
  • Carbon-accounting-as-software research corpus

    Researched whether corporate carbon measurement can be sold as maintained software instead of consulting hours, producing a fully sourced decision corpus; the platform itself is in design only.

    4d4 of 4 days
  • Transit data-feed quality auditANONYMIZED

    Validated five municipalities' public-transport data feeds against the international standard and delivered a written quality report.

    3d2 of 3 days
  • E-invoicing regulatory watch brief

    Produced a compact regulatory watch brief on Bulgaria's announced e-invoicing mandate: what is law versus announcement, the timeline, and the standards involved.

    1d1 of 1 days
  • Verifiable-voting platform design

    Researched and specified an open-source verifiable-voting platform: vision, architecture, threat model, and ratified data contracts, building on a 2013 concept co-authored with a named collaborator; no code yet.

    ÷2.07 of 14 days
  • Replaced our own 15-year weekly-spreadsheet sales practice with a secure, EU-hosted pipeline app that runs for a few dollars a month; in production use within days.

    ÷1.47 of 10 days
  • National water-sector digital strategy

    Completed an independent, assurance-checked national strategy for digitalizing the urban water sector, grounded in four verified knowledge bases.

    2d2 of 2 days
  • Green-building lead engine (Sofia)

    Built a register-grounded database of a capital city's large construction projects and their investors for green-building consulting: verified contacts, outreach angles, and a market-whitespace finding.

    1d1 of 1 days

37 projects shown · window 05 Jan21 Jul 2026 (198 days) · 139 distinct working days across all 44 projects · computed, not estimated